Downtime Pareto
134h 11m
lost / shift
The vital few (5 of 7 reasons) drive 80% of lost minutes.
MRP EXCEPTION — 4 materials are below one day of coverage, putting ₹3,05,70,226 of scheduled production at risk.
The vital few (5 of 7 reasons) drive 80% of lost minutes.
OEE, downtime, SPC, and MRP — the operating picture a plant floor runs on.
Production-grade shop-floor and enterprise systems, engineered to spec.
One of AhiXLight's live demos at ahixlight.com/demos — see the full suite.