// oee_core.log
Overall Equipment Effectiveness
All Plants
78.5%
OEE
World Class
AAvailability89.7%
PPerformance90.1%
QQuality97.1%
A × P × Q = OEE
MRP EXCEPTION — 4 materials are below one day of coverage, putting ₹3,05,70,226 of scheduled production at risk.
OEE, downtime, SPC, and MRP — the operating picture a plant floor runs on.
Production-grade shop-floor and enterprise systems, engineered to spec.
One of AhiXLight's live demos at ahixlight.com/demos — see the full suite.