MRP EXCEPTION 4 materials are below one day of coverage, putting ₹3,05,70,226 of scheduled production at risk.

Back to Plant Manager

Defect Rate Control Chart

2 OOC
out of control

3.37% · UCL 6.68% · LCL 0.06% · limits = x̄ ± 3σ

AhiXLight · Manufacturing Systems

Forgeline

0%
Initializing Forgeline Core...
Plant Systems

OEE, downtime, SPC, and MRP — the operating picture a plant floor runs on.

MES / ERP Builds

Production-grade shop-floor and enterprise systems, engineered to spec.

AhiXLight Portfolio

One of AhiXLight's live demos at ahixlight.com/demos — see the full suite.

Need a custom plant system built?